Meter cupboard & main connection. Safe and future-proof.
An outdated or overcrowded meter cupboard is a risk and holds back an upgrade to three-phase, a charge point or a heat pump. We renew the meter cupboard, handle the application to the grid operator and hand everything over neatly, to standard.
Everything for your meter cupboard, from one company
Meter cupboard renewal: a new distribution board with RCBOs, surge protection and room for extra circuits.
- Renewing the meter cupboard
- Upgrade from single- to three-phase
- Main connection & meter board
- Smart energy monitoring in the meter cupboard
More electrical work under one roof.
Feel free to combine: one point of contact and one schedule for everything below.
Inspection of your installation to NEN 1010, including a report.
Questions about electrics.
With rewireable fuses, no RCD protection or circuits that trip regularly: yes. If in doubt, we carry out an inspection to NEN 1010 and you get a report on what is and isn’t needed.
Yes. Upgrading to three-phase, a new meter cupboard or an extra connection: we register it and coordinate with the grid operator.
From a single circuit to a complete installation.
Tell us what is going on. After a survey you get a fixed price.
Expert Exact · The Hague · +31 70 205 10 11 · info@expertexact.nl